Build Update: Driveway, Drywall and a Dry Basement

I can’t believe I haven’t blogged all week! I also can’t believe it’s September already. September is the month that our house will be finished, it’s also the month that I get to go to Vegas for the first time and the month of my half birthday. Yesterday was also the fourth anniversary of finally moving to Cleveland after months of a grueling hour+ commute to work.

Since I know everyone is really curious about progress on our house, here’s an update!

Drywall

All of our drywall is hung and they are finishing the mudding by Monday.

People told us two things about this stage of building: 1. Things will seem to slow way down 2. The house will feel a lot smaller.

Things do seem to have slowed down, but I don’t feel like the house feels smaller, it feels more like a house to me! Brad thinks it seems smaller though.

Continue reading

Build Update: Siding, insulation and dates

Things with our house are moving along very quickly now!

Brad met with the Guardian folks two Fridays ago to address our home high-tech home selections and mark in the house where things needed to be installed. They came in and did all the wiring on Monday. On Monday night we walked through the house and Brad discovered that they had run cat5 cable rather than the cat6 cable we paid extra for. Brad called them on it and on Tuesday they ran the right wires.

On Wednesday, we had out pre-drywall meeting, where we walked through the house and went over everything we selected again, except in the house.

On Sunday, my mom and her husband came to see our house. We were able to show them a sided, framed house. Our plumbing is in, our electrical is run, our HVAC is installed, our gas lines are in, our utilities are in, our sub floor is screwed down, the whole place is insulated and there are sheets of drywall waiting to be hung. Continue reading